Iran resumes 20% uranium enrichment at Fordow nuclear site

Kazem Gharibabadi, Iran’s Ambassador to the International Atomic Energy Agency (IAEA), wears a face mask as he arrives for the Board of Governors of the IAEA at the agency’s headquarters in Vienna, Austria on Sept. 14, 2020. (File/AFP)
Short Url
Updated 04 January 2021
Follow

Iran resumes 20% uranium enrichment at Fordow nuclear site

  • The move is the latest of several recent Iranian breaches of the 2015 nuclear deal

DUBAI: Iran has resumed 20 percent uranium enrichment at its underground Fordow nuclear facility, the government spokesman told the semi-official Mehr news agency on Monday, a level of purity that is not allowed under Tehran’s 2015 nuclear pact with six major powers.

The move is the latest of several recent Iranian breaches of the deal, which it started violating in 2019 in retaliation for Washington’s withdrawal from the agreement and the reimposition of US sanctions against Tehran.

“A few minutes ago, the process of producing 20 percent enriched uranium has started in Fordow enrichment complex,” Ali Rabeie told Mehr.

On January 1, the International Atomic Energy Agency said Tehran had told the watchdog it planned to resume enrichment up to 20 percent at Fordow site, which is buried inside a mountain.


Algeria inaugurates strategic railway to giant Sahara mine

President Tebboune attended an inauguration ceremony in Bechar. (AFP file photo)
Updated 02 February 2026
Follow

Algeria inaugurates strategic railway to giant Sahara mine

  • The mine is expected to produce 4 million tons per year during the initial phase, with production projected to triple to 12 million tons per year by 2030
  • The project is financed by the Algerian state and partly built by a Chinese consortium

ALGEIRS: Algerian President Abdelmadjid Tebboune on Sunday inaugurated a nearly 1,000-kilometer (621-mile) desert railway to transport iron ore from a giant mine, a project he called one of the biggest in the country’s history.
The line will bring iron ore from the Gara Djebilet deposit in the south to the city of Bechar located 950 kilometers north, to be taken to a steel production plant near Oran further north.
The project is financed by the Algerian state and partly built by a Chinese consortium.
During the inauguration, Tebboune described it as “one of the largest strategic projects in the history of independent Algeria.”
This project aims to increase Algeria’s iron ore extraction capacity, as the country aspires to become one of Africa’s leading steel producers.
The iron ore deposit is also seen as a key driver of Algeria’s economic diversification as it seeks to reduce its reliance on hydrocarbons, according to experts.
President Tebboune attended an inauguration ceremony in Bechar, welcoming the first passenger train from Tindouf in southern Algeria and sending toward the north a first charge of iron ore, according to footage broadcast on national television.
The mine is expected to produce 4 million tons per year during the initial phase, with production projected to triple to 12 million tons per year by 2030, according to estimates by the state-owned Feraal Group, which manages the site.
It is then expected to reach 50 million tons per year in the long term, it said.
The start of operations at the mine will allow Algeria to drastically reduce its iron ore imports and save $1.2 billion per year, according to Algerian media.