
Pakistan Petroleum restores gas output at Adam West X-1 well after six-year shutdown
- Workover restores gas flow at 8.5 MMscfd after production ceased due to water breakthrough in 2019
- Well to be tied into Hala facilities following rig demobilization, Pakistan Petroleum says
